SIS100 Tunnel Design and Status
release_ynu432654bgtndjsseuvcl5cz4
by
Carsten Omet, JöRg Falenski, Georg Fehrenbacher, Achim Fischer, Heike Kisker, Markus Konradt, Alexej Sokolov, Peter Spiller, Volker RW Schaa, Arduini, Gianluigi (Ed.), Pranke, Juliana (Ed.), Seidel, Mike (Ed.) (+1 others)
2017 Volume IPAC2017, Denmark
Abstract
As the FAIR project is proceeding, many of the building and tunnel designs in the meanwhile are frozen and documents are prepared for tendering. For the future FAIR driver accelerator, SIS100, the accelerator tunnel T110 comprises a 1100 m long tunnel, which has a depth of 17 m under ground. In this paper, its environmental boundary conditions, design principles and the finally chosen layout are presented.
In text/plain
format
Archived Files and Locations
application/pdf 3.0 MB
file_mdvmfsie6rh2xe7vqnsv2cppci
|
accelconf.web.cern.ch (web) web.archive.org (webarchive) |
article-journal
Stage
published
Date 2017-05-17
access all versions, variants, and formats of this works (eg, pre-prints)
Datacite Metadata (via API)
Worldcat
wikidata.org
CORE.ac.uk
Semantic Scholar
Google Scholar