SIS100 Tunnel Design and Status release_ynu432654bgtndjsseuvcl5cz4

by Carsten Omet, JöRg Falenski, Georg Fehrenbacher, Achim Fischer, Heike Kisker, Markus Konradt, Alexej Sokolov, Peter Spiller, Volker RW Schaa, Arduini, Gianluigi (Ed.), Pranke, Juliana (Ed.), Seidel, Mike (Ed.) (+1 others)

Published by JACoW, Geneva, Switzerland.

2017   Volume IPAC2017, Denmark

Abstract

As the FAIR project is proceeding, many of the building and tunnel designs in the meanwhile are frozen and documents are prepared for tendering. For the future FAIR driver accelerator, SIS100, the accelerator tunnel T110 comprises a 1100 m long tunnel, which has a depth of 17 m under ground. In this paper, its environmental boundary conditions, design principles and the finally chosen layout are presented.
In text/plain format

Archived Files and Locations

application/pdf  3.0 MB
file_mdvmfsie6rh2xe7vqnsv2cppci
accelconf.web.cern.ch (web)
web.archive.org (webarchive)
Read Archived PDF
Preserved and Accessible
Type  article-journal
Stage   published
Date   2017-05-17
Work Entity
access all versions, variants, and formats of this works (eg, pre-prints)
Catalog Record
Revision: e07976a5-97b0-4054-8e89-5f37123fae71
API URL: JSON