Delay Analysis in Construction Project a Case Study - Alkut Olympic Stadium release_t6yco7oclfbyjmeyykycjqs42a

by Ahmed Multashi, Rohit Salgude

Released as a article-journal by International Journal of Science and Research.

2013  

Abstract

Now days the planned duration is one of the main criteria when judging whether a construction project is a failure or not. Additionally, construction designing is claimed to achieve success if the project completes inside the planned duration; or if it identifies a problem well prior to, thereby alerting the project management team to resolve the problem before it causes any impact on the completion date. This analysis of the Olympic sports stadium in Alkut delay factors investigated. Participant observation was adopted an approach has advised that from the descriptive principles of anthropology? The last Olympic game stadium construction until completion prior professional conduct as a senior design engineer major human-relations factors were discovered and known that the management and development had an impact on performance of the designing. Success factors related to say and. It is argued that this project a shadow culture exists among participants, an embedded interactive supervisor perspective angle just clear that was found. Designing method and its effectiveness planning this shadow culture within the team and immediately the quality of relationships between the stakeholders associated with human difference management serves to modify. The analysis concludes by questioning the parable amongst project participants that construction coming up with could be a mechanistic method that has got to be conducted entirely by the look team.
In text/plain format

Archived Files and Locations

application/pdf  450.7 kB
file_dlvzpmmf7vewnjfxmdhuayjace
web.archive.org (webarchive)
www.ijsr.net (web)
Read Archived PDF
Preserved and Accessible
Type  article-journal
Stage   unknown
Year   2013
Work Entity
access all versions, variants, and formats of this works (eg, pre-prints)
Catalog Record
Revision: 5430bf1c-f645-409e-9397-7a12ce3b5524
API URL: JSON