Cost Module for GE Radiant Quench IGCC Aspen Plus Model
release_fjg6hxf3fnbudpyn4vs6o7za24
by
Edward Rubin, Michael B. Berkenpas, Chao Chen
(2018)
Abstract
This report describes the input parameters in the cost model developed for an integrated gasification combined cycle
plant (IGCC) operating with a GE radiant quench gasifier. The performance model for this system was developed by the
Department of Energy's National Energy Technology Laboratory (NETL) as an Aspen Plus steady-state process
simulation. The performance model was delivered to Carnegie Mellon for the purpose of adding a cost model, as
described in this report. Parameters from the performance model that are required for the cost model are identified in this
report.
The cost model is divided into four separate areas: (1) financing parameters, (2) capital cost parameters, (3) operating
and maintenance parameters, and (4) levelized cost parameters. Each input parameter is described briefly in the
following sections. Intermediate and final result parameters are not described here; however, a final cost report is
provided for two illustrative cases.
In text/plain
format
Archived Files and Locations
application/pdf 97.8 kB
file_v6r6khwnp5hade7z475ckoz52u
|
web.archive.org (webarchive) s3-eu-west-1.amazonaws.com (publisher) |
article-journal
Stage
published
Date 2018-04-02
access all versions, variants, and formats of this works (eg, pre-prints)
Datacite Metadata (via API)
Worldcat
wikidata.org
CORE.ac.uk
Semantic Scholar
Google Scholar