Modelagem da programação de navios para otimização no canal de acesso ao porto de Santos.
release_2h65btzarbdhzisst4duoyezxu
by
Daniel de Oliveira Mota
References
NOTE: currently batch computed and may include additional references sources, or be missing recent changes, compared to entity reference list.Showing 1 - 30 of 81 references (in 105ms) | ||
---|---|---|
[b0] via grobid |
AHUJA, R. K.; MAGNANTI, T. L.; ORLIN, J. B. Network flows: theory, algorithms and applications. [s.l: s.
| |
[b1] via grobid |
ALFREDINI, P.; ARASAKI, E. Obras e gestão de portos e costa. São Paulo: Editora Blucher, 2009.
| |
[b2] via grobid |
ALMAZ, O. A.; ALTIOK, T. Simulation modeling of the vessel traffic in Delaware River: Impact of deepening on port performance. Simulation Modelling Practice and Theory, v. 22, p. 146-165, 2012.
| |
[b3] via grobid |
BANKS, J. et al. Discrete-Event System Simulation. [s.l.] Prentice Hall, 2000. BAZARAA, M. S.; JARVIS, J. J.; SHERALI, H. D. Linear programming and network flows. [s.l.] John Wiley & Sons, 2011.
| |
[b4] via grobid |
BNDES. Disponível em: <www.bndes.gov.br>.
| |
[b5] via grobid |
BRUCKER, P.; BRUCKER, P. Scheduling algorithms. [s.l.] Springer, 2007. v. 3
| |
[b6] via grobid |
CASAVANT, T. L.; KUHL, J. G. A taxonomy of scheduling in general-purpose distributed computing systems. Software Engineering, IEEE Transactions on, v. 14, n. 2, p. 141-154, 1988.
| |
[b7] via fuzzy |
Inventory management in a lateral collaborative manufacturing supply chain: a simulation study
Felix T.S. Chan, Anuj Prakash 2012 International Journal of Production Research doi:10.1080/00207543.2011.628709 | |
[b8] via grobid |
CHURCHMAN, C. W.; WEST, C. The systems approach. [s.l.] Dell New York, 1968.
| |
[b9] via grobid |
CHWIF, L.; MEDINA, A. C. Modelagem e simulação de eventos discretos. [s.l.] Afonso C. Medina, 2006.
| |
[b10] via grobid |
CODESP. Disponível em: <www.codesp.gov.br>. Acesso em: 26 dez. 2013.
| |
[b11] via grobid |
CODESP. Santos se mantem como principal porto de contêineres da América Latina. Disponível em: <http://www.portodesantos.com.br/pressRelease.php?idRelease=873>. Acesso em: 28 nov. 2015.
| |
[b12] via grobid |
CRANE, B. D. Getting Started with JavaFX. RefCardz, n. 0076-6879 (Print), p. 1-6, 2009.
| |
[b13] via fuzzy |
Minimizing the number of tankers to meet a fixed schedule
G. B. Dantzig, D. R. Fulkerson 1954 Naval Research Logistics Quarterly doi:10.1002/nav.3800010309 |
web.archive.org [PDF]
|
[b14] via grobid |
DONG, X.; HUANG, H.; CHEN, P. An improved NEH-based heuristic for the permutation flowshop problem. Computers and Operations Research, v. 35, n. 12, p. 3962-3968, 2008.
| |
[b15] via grobid |
EDELKAMP, S.; SCHROEDL, S. Heuristic search: theory and applications. [s.l.]
| |
[b16] via grobid |
FAGERHOLT, K.; RONEN, D. Bulk ship routing and scheduling: solving practical problems may provide better results. Maritime Policy & Management, v. 40, n. 1, p. 48-64, 2013.
| |
[b17] via grobid |
FONTES, D. B. M. M.; GONÇALVES, J. F. Heuristic solutions for general concave minimum cost network flow problems. Networks, v. 50, n. 1, p. 67-76, 2007.
| |
[b18] via fuzzy |
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
J M Framinan, J N D Gupta, R Leisten 2004 Journal of the Operational Research Society doi:10.1057/palgrave.jors.2601784 |
web.archive.org [PDF]
|
[b19] via grobid |
G1. Navios esperam até 16 dias para atracar em porto do país, diz MDIC. Disponível em: <http://g1.globo.com/economia/noticia/2013/03/navios-esperam-ate- 16-dias-para-atracar-em-porto-do-pais-diz-mdic.html>. Acesso em: 28 nov. 2015a.
| |
[b20] via grobid |
G1. Entenda os principais pontos da MP dos Portos aprovada pelo Congresso. Disponível em: <http://g1.globo.com/politica/noticia/2013/05/entenda-os-principais- pontos-da-mp-dos-portos-aprovada-pelo-congresso.html>. Acesso em: 28 nov. 2015b.
| |
[b21] via grobid |
HANSEN, R. C. Eficiência global dos equipamentos: uma poderosa ferramenta de produção/manutenção para aumento dos lucros. Porto Alegre: Bookman, 2006.
| |
[b22] via grobid |
HENDERSON, S. G. et al. A simulation model to improve warehouse operationsProceedings, Winter Simulation Conference. Anais...2012
| |
[b23] via grobid |
HENTENRYCK, P. VAN;
| |
[b24] via grobid |
MICHEL, L. Constraint-based local search. [s.l.] The MIT Press, 2009.
| |
[b25] via grobid |
HUNDT, R. Loop recognition in c++/java/go/scala. Proceedings of Scala Days, v. 2011, 2011. INTERNATIONAL ASSOCIATION OF LIGHTHOUSE AUTHORITIES AND INTERNATIONAL MARITIME PILOTS ASSOCIATION. Approach Channels: Preliminary Guidelines. [s.l.] Pianc, 1995.
| |
[b26] via fuzzy |
Stochastic flow shop scheduling model for the Panama Canal
J Jackman, Z Guerra de Castillo, S Olafsson 2011 Journal of the Operational Research Society doi:10.1057/jors.2009.188 |
web.archive.org [PDF]
|
[b27] via grobid |
LEISERSON, C. E. et al. Introduction to algorithms. [s.l: s.n.].
| |
[b28] via grobid |
LEUNG, J. Y.-T. Handbook of scheduling. Algorithms, models and performance analysis. [s.l: s.n.].
| |
[b29] via grobid |
LI, X.; ZHAO, H. Greedy Algorithm Solution of Flexible Flow Shop Scheduling Problem. International Journal of Computer Science and Network Security, v. 9, n. 11, p. 9-12, 2009.
| |
|