Modelagem da programação de navios para otimização no canal de acesso ao porto de Santos. release_2h65btzarbdhzisst4duoyezxu

by Daniel de Oliveira Mota

References

NOTE: currently batch computed and may include additional references sources, or be missing recent changes, compared to entity reference list.
Fuzzy reference matching is a work in progress!
Read more about quality, completeness, and caveats in the fatcat guide.
Showing 1 - 30 of 81 references (in 105ms)
[b0]

via grobid
AHUJA, R. K.; MAGNANTI, T. L.; ORLIN, J. B. Network flows: theory, algorithms and applications. [s.l: s.
[b1]

via grobid
ALFREDINI, P.; ARASAKI, E. Obras e gestão de portos e costa. São Paulo: Editora Blucher, 2009.
[b2]

via grobid
ALMAZ, O. A.; ALTIOK, T. Simulation modeling of the vessel traffic in Delaware River: Impact of deepening on port performance. Simulation Modelling Practice and Theory, v. 22, p. 146-165, 2012.
[b3]

via grobid
BANKS, J. et al. Discrete-Event System Simulation. [s.l.] Prentice Hall, 2000. BAZARAA, M. S.; JARVIS, J. J.; SHERALI, H. D. Linear programming and network flows. [s.l.] John Wiley & Sons, 2011.
[b4]

via grobid
BNDES. Disponível em: <www.bndes.gov.br>.
[b5]

via grobid
BRUCKER, P.; BRUCKER, P. Scheduling algorithms. [s.l.] Springer, 2007. v. 3
[b6]

via grobid
CASAVANT, T. L.; KUHL, J. G. A taxonomy of scheduling in general-purpose distributed computing systems. Software Engineering, IEEE Transactions on, v. 14, n. 2, p. 141-154, 1988.
[b7]

via fuzzy
Inventory management in a lateral collaborative manufacturing supply chain: a simulation study
Felix T.S. Chan, Anuj Prakash
2012   International Journal of Production Research
doi:10.1080/00207543.2011.628709 
[b8]

via grobid
CHURCHMAN, C. W.; WEST, C. The systems approach. [s.l.] Dell New York, 1968.
[b9]

via grobid
CHWIF, L.; MEDINA, A. C. Modelagem e simulação de eventos discretos. [s.l.] Afonso C. Medina, 2006.
[b10]

via grobid
CODESP. Disponível em: <www.codesp.gov.br>. Acesso em: 26 dez. 2013.
[b11]

via grobid
CODESP. Santos se mantem como principal porto de contêineres da América Latina. Disponível em: <http://www.portodesantos.com.br/pressRelease.php?idRelease=873>. Acesso em: 28 nov. 2015.
[b12]

via grobid
CRANE, B. D. Getting Started with JavaFX. RefCardz, n. 0076-6879 (Print), p. 1-6, 2009.
[b13]

via fuzzy
Minimizing the number of tankers to meet a fixed schedule
G. B. Dantzig, D. R. Fulkerson
1954   Naval Research Logistics Quarterly
doi:10.1002/nav.3800010309 
web.archive.org [PDF]
[b14]

via grobid
DONG, X.; HUANG, H.; CHEN, P. An improved NEH-based heuristic for the permutation flowshop problem. Computers and Operations Research, v. 35, n. 12, p. 3962-3968, 2008.
[b15]

via grobid
EDELKAMP, S.; SCHROEDL, S. Heuristic search: theory and applications. [s.l.]
[b16]

via grobid
FAGERHOLT, K.; RONEN, D. Bulk ship routing and scheduling: solving practical problems may provide better results. Maritime Policy & Management, v. 40, n. 1, p. 48-64, 2013.
[b17]

via grobid
FONTES, D. B. M. M.; GONÇALVES, J. F. Heuristic solutions for general concave minimum cost network flow problems. Networks, v. 50, n. 1, p. 67-76, 2007.
[b18]

via fuzzy
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
J M Framinan, J N D Gupta, R Leisten
2004   Journal of the Operational Research Society
doi:10.1057/palgrave.jors.2601784 
web.archive.org [PDF]
[b19]

via grobid
G1. Navios esperam até 16 dias para atracar em porto do país, diz MDIC. Disponível em: <http://g1.globo.com/economia/noticia/2013/03/navios-esperam-ate- 16-dias-para-atracar-em-porto-do-pais-diz-mdic.html>. Acesso em: 28 nov. 2015a.
[b20]

via grobid
G1. Entenda os principais pontos da MP dos Portos aprovada pelo Congresso. Disponível em: <http://g1.globo.com/politica/noticia/2013/05/entenda-os-principais- pontos-da-mp-dos-portos-aprovada-pelo-congresso.html>. Acesso em: 28 nov. 2015b.
[b21]

via grobid
HANSEN, R. C. Eficiência global dos equipamentos: uma poderosa ferramenta de produção/manutenção para aumento dos lucros. Porto Alegre: Bookman, 2006.
[b22]

via grobid
HENDERSON, S. G. et al. A simulation model to improve warehouse operationsProceedings, Winter Simulation Conference. Anais...2012
[b23]

via grobid
HENTENRYCK, P. VAN;
[b24]

via grobid
MICHEL, L. Constraint-based local search. [s.l.] The MIT Press, 2009.
[b25]

via grobid
HUNDT, R. Loop recognition in c++/java/go/scala. Proceedings of Scala Days, v. 2011, 2011. INTERNATIONAL ASSOCIATION OF LIGHTHOUSE AUTHORITIES AND INTERNATIONAL MARITIME PILOTS ASSOCIATION. Approach Channels: Preliminary Guidelines. [s.l.] Pianc, 1995.
[b26]

via fuzzy
Stochastic flow shop scheduling model for the Panama Canal
J Jackman, Z Guerra de Castillo, S Olafsson
2011   Journal of the Operational Research Society
doi:10.1057/jors.2009.188 
web.archive.org [PDF]
[b27]

via grobid
LEISERSON, C. E. et al. Introduction to algorithms. [s.l: s.n.].
[b28]

via grobid
LEUNG, J. Y.-T. Handbook of scheduling. Algorithms, models and performance analysis. [s.l: s.n.].
[b29]

via grobid
LI, X.; ZHAO, H. Greedy Algorithm Solution of Flexible Flow Shop Scheduling Problem. International Journal of Computer Science and Network Security, v. 9, n. 11, p. 9-12, 2009.
Showing 1 - 30 of 81 references  next »